Rugby Wind Farm 230kV Transmission Line

KONICA MINOLTA DIGITAL CAMERA  IMG_1784

Location:  North Dakota

Description:  This project included the construction of 10 miles of single-circuit 230kV transmission line on wood poles.  Great Southwestern’s project scope also included the construction of 6.5 miles of a 34.5kV overhead collector system, 168,000 square feet of a 34.5kV underground collector system, and constructioh of a new 230/34.5kV collector substation including foundations, grouding, switch gear, a reactor bank and bus.

Client:  Rugby Wind LLC/ Iberdrola Renewables

Completion Date:  2009