Skywest Transmission Structure Replacements Energized

Skywest Transmission Structure Replacements

Client Oncor
Completion Date 2023
Location West Texas
Completed by Great Southwestern Construction

Great Southwestern Construction removed 10 miles of existing concrete delta configured 138kV wooden poles, installed new double-circuit steel poles, and installed new circuit, all while the existing circuit was energized.