Cedar Point Wind Energy Project

102_2837  IMAGE_290  102_2840

Location:  Colorado

Description:  Three EPC projects were associated with the overall construction and operation of the CedarPoint250MW wind farm. Substation construction was completed for two new 230/34.5kV stations, Cedar Point East and Cedar Point West. Both stations included all engineering, procurement and civil site works, plus installation of foundations, steel and buswork, 230/34.5kV power transformer, 230kV circuit breakers, switches, capacitor banks, reactors, power factor compensation system, control buildings, relay & control panels, power and control cables plus testing and commissioning work. The project also included constructing the Missle Site 230kV Capacitor Switching Station consisting of installing breakers, switches, capacitor banks, power and control cable plus electrical testing.

Client:  RES Americas

Completion Date:  2011