Collection Systems for Wind Farms

Red Hills Substation pulling conductor  Red Hills Microwave twr  Red Hills Collector 9

Red Hills Wind Farm – Oklahoma

Descripton:  This EPC project comprised the construction of a new switching station and 34.5/230kV substation which included foundations, ground grid, conduit, structural steel, a control building and commissioning.  The project also included the construction of a new 34.5 underground collection system.

Client:  M.A. Mortenson Company (General Contractor)

Completion Date:  2008

IMG_3738  006  001

Magic Valley Wind Farm – Texas

Description:  This EPC project consisted of the construction of 258,000 circuit feet of a 34.5kV underground collection system and a new 138kV substation including two 138kV breakers, eight 34.5KV breakers, all related steel, bus, conduits, grounding, foundations, cable trench, control building and site work.

Client:  Magic Valley Wind Farm, LLC

Completion Date:  2013